Leytonstone

We were given specific instructions and responsibilities to undertake the groundwork preparations, including the excavation, foundation laying, and brickwork, as well as the construction of the reinforced concrete (RC) frame for the project. The site presented numerous challenges, particularly due to its location on the corner of a busy main road. Despite these logistical obstructions, […]

Balham

We were assigned the responsibility of performing the initial groundwork and building the reinforced concrete frame for the structure. This building includes several commercial units on the lower level, as well as residential units on the upper floors.

Edgware

Construction of a large commercial office block including the full groundwork’s, RC Frame and brickwork.

Romford

Our client instructed us to undertake construction of 44 Residential flats with a large basement and commercial buildings. This project was based over 2 blocks in a busy part of Romford. We carried out the excavations and construction of the basement as well as the groundworks and installing the RC frame for 2 blocks.

Rickmansworth

The first stage involved access and routing activities, which were succeeded by extensive excavation. Next, the primary deep drainage system was installed, followed by the construction of a substantial waterproof basement and reinforced concrete frame. Subsequent external work was then carried out to ensure the project timeline was adhered to. The precise sequencing of the […]

Kings Cross

Constructed on the location of The Keskidee Centre, or Keskidee Arts Centre, Britain’s inaugural arts hub for the black community was established in 1971. The music video for ‘is this love’ by Bob Marley was shot at this venue. Following the building’s destruction by fire, we were commissioned to oversee its reconstruction. Our responsibilities included […]

Nottingham

We were assigned to carry out the construction of a large residential block including a basement. We undertook the groundworks, masonry, and the pre-cast floors.

Gunnersbury

We were assigned the responsibility of performing the initial groundwork and building the reinforced concrete frame for the structure. Once completed this will provide new homes for social housing with the Hounslow borough.

Hayes

We were appointed by the client to undertake the construction of a large basement as well as the extensive groundworks and 10 storeys of RC Frame. This site was formally the Nestle factory and will now form part of the new Hayes Village providing 1386 news homes. When complete the buildings will be for commercial […]

London Bridge

This City of London-based site faced significant access restrictions due to its location in a bustling area, presenting challenges for material delivery. We were tasked with completing the RC frame after the initial contractor struggled with the project’s complexity. Bela successfully took over, bringing the project back on schedule for constructing a 7-story building and […]